CHP - ideal location required

The required space should be considered right from the start.

The ASV 21/46 has a footprint of 0,8 m 1,20 m. For set up and service clearance surfaces should be considered.

Please, don't hesitate to ask for advice.

The minimum clearance surface is shown in a PDF sheet.

Floor plan ASV 21/46 (- KB)

 
umweltfreundlich-heizen.de
energiewerkstatt.de
bhkw-wartung.de
© 2012 energiewerkstatt GmbH & Co. KG