An original moves in:
Before connecting the CHP some preparations are necessary and certain requirements have to be met.
The CHP is linked to the heating current water. A correctly dimensioned bus bar and gas connection should be available.
For new buildings the required place should be considered right from the start.
| Bonding ... | |
![]() |
hydraulic |
![]() |
electric |
![]() |
spacial |


