Extent of work

At every inspection, the CHP will be reviewed in accordance with optimal defined diagnostic routines.

In addition, basic maintenance work such as renewing the spark plugs. All necessary materials and labour costs other than oil and coolant are included – the disposal of used oil and oil filter is also included. On new spare parts you get 12 months warranty, if it is not subject to wear.

The individual steps can be found in the following table.

Overview of our service packages

ASV 21, 20, 15 and 14
Inspection and maintenance level 1 (every 6.000 operating hours)
Inspection and maintenance level 1 und 2 (every 6.000 operating hours)
Repair – exhaust gas heat exchanger
Repair – engine overhaul

Maintenance and ServiceWorks
Inspection and maintenance level 1
(every 6.000 operating hours)
Control and monitor (every 6,000 operating hours) operating values; Visual inspection Gas Range; Check oil reserve; Change spark plugs; Change the oil filter; Dispose of old oil filter; Measure exhaust backpressure in the engine; Change purge; Replace air filters; Condensate trap rinse; Clean heating circuit filter; Check tightness of the oil and water circuit in CHP; Visual inspection of the exhaust system; Check the engine water pressure and if necessary top up with ASV 21 or 40 (coolant will be charged if necessary); Check the oil level; Check expansion vessel; Check Surveillance-, storage and control functions; Exhaust gas sensor - function control; Oil change at ASV 21 or 40; Timing belt and tensioner switch; Inspect and clean the gas regulator, and -ventils ™ mixer; Switch ignition cable; Check the harness for integrity; Check oil mechanism; Check PWT spreads; Ensure disposal of used oil / used oil canisters; Replace engine water pump; (Oil for the reserve tank is charged separately according to the required amount.); Inspect and clean the oil pressure equalization hose; Heating water analysis; Emission testing
Inspection and maintenance level 2
(every 12.000 operating hours)
Exchange endshield ASV 21; Replace water pressure switch; Exchange the gas mixer housing; Automatic gas / air mixture control (lambda control)
Repair- exhausted gas heat exchangerUpkeep-measure exhaust for gas, heat exchanger exhaust and backpressure on the engine; Check exhaust hose; Change exhaust gas heat exchanger at ASV 21; Change catalyst; Emission testing
Repair- engine overhaulExpand upkeep-engine overhaul old motor and install the repaired engine; All existing CHP attachments on repaired engine plant; Insert new seals at engine swap; Emission testing

Zum nächsten Bereich springen